FIELD-PROVEN TECHNOLOGY · REAL RAIL COLOMBIA CASE
STOP BLACK SMOKE
Railway
Reduce fuel consumption by up to 20% on your locomotives, without modifying the engine.
Fuel consumption
Lower emissions (CO, PM, HC)
Up to 3 integrated technologies
Engine modifications
Fuel consumption
Lower emissions (CO, PM, HC)
Up to 3 integrated technologies
Engine modifications
Three technologies, one goal
Three systems working together on the same engine: combustion, lubrication and data. It's the combination we've already proven in the field, not a lab promise.
Fuel Catalyst
Combustion catalyst that optimises the air-fuel mix. Reduces consumption, lowers exhaust gas temperature and cuts pollution, without touching the engine.
Dual Fuel H2
On-demand hydrogen generation, using polymer technology, combined with the fuel only while the engine is running. Improves combustion and helps reduce emissions in compatible engines.
Fleet Management
Real-time monitoring and telemetry for every locomotive: consumption, temperatures and performance measured and verified, not estimated.
NEW
Pistons: before and after
During the inspection of U10B locomotive No. 64, only 5 of the original 12 pistons were still usable. Instead of replacing the whole engine, we recoated 16 U10B pistons and 6 Cummins pistons with SUL 2000 (graphene), returning them to service condition.
1. Before — disassembly
2. SUL 2000 (graphene) coating process
3. After — ready for assembly
4. Final assembly on the engine
REAL RESULTS
Rail Colombia · Paz del Río Steel Mill
Locomotive U10B No. 64, 64 tons. Field test with direct measurement of consumption, gas temperature and emissions, before and after application Fuel Catalyst and MAEE.
Exceptional scenario: the locomotive started from a very poor maintenance condition, which amplifies the measured improvement. Results in fleets with better prior maintenance may vary.
Consumption per trial (-33%)
Emissions
Significantly reduced
STOP BLACK SMOKE
Fuel Catalyst It is registered with the U.S. EPA as «Fuel Katalyst Treatment» (No. 273720001, 24/04/2014, under 40 CFR 79.23).
Total control of your fleet, in real time
The "Fleet Management" part is not a promise: it is a monitoring and telemetry panel that logs consumption, temperatures and performance for each locomotive, so improvement figures can be verified, not just promised.
How it works, in 4 phases
Diagnosis
We measure consumption, temperatures and the condition of the engine and pistons before touching anything.
Measurement
We record the same parameters after implementation and compare them against the baseline.
Scale-up
We roll out the technology to the rest of the fleet with data already verified.
Applicable to
Freight
Heavy freight, mining and industrial trains.
Passenger
Passenger rolling stock, with the same fuel savings.
Auxiliary vehicles
Machinery and vehicles supporting rail operations.
Ready to measure it on your own fleet?
We start with a diagnosis and a pilot test on one locomotive in your fleet, with measured data, not estimates.